  1. ١

    The SDLC is the process of:

  2. ٢

    Which SDLC phase produces the 'system proposal' and gathers requirements?

  3. ٣

    The deliverable of the Planning phase is the:

  4. ٤

    A startup's requirements are vague; the client wants a quick working model to try and refine with users. Which methodology best fits?

  5. ٥

    A major disadvantage of the Waterfall model is:

  6. ٦

    A smaller-scale working model of the requirements or a proposed design is a:

  7. ٧

    Which is a category of RAD?

  8. ٨

    A disadvantage of RAD is that:

  9. ٩

    Extreme Programming (XP) is characterized by:

  10. ١٠

    Which statement distinguishes Agile from RAD?

  11. ١١

    The SDLC provides a structured set of phases from idea to delivered system.

  12. ١٢

    The Design phase determines HOW the system will operate (hardware, UI, databases).

  13. ١٣

    The Implementation phase delivers the new system and a maintenance plan.

  14. ١٤

    Waterfall makes it easy and cheap to accommodate change late in the project.

  15. ١٥

    Waterfall is a good choice when requirements are very well known and stable.

  16. ١٦

    Parallel development performs design and implementation in parallel to reduce time.

  17. ١٧

    In throwaway prototyping, the prototype becomes the final system.

  18. ١٨

    Agile development relies on face-to-face communication.

  19. ١٩

    In XP, programmers write code in pairs.

  20. ٢٠

    RAD is based on designing prototypes, whereas Agile is not.

  21. ٢١

    Match each SDLC phase with its deliverable.

    • Planning
    • Analysis
    • Design
    • Implementation

    الإجابات

  22. ٢٢

    Match each SDLC phase with its guiding question.

    • Planning
    • Analysis
    • Design
    • Implementation

    الإجابات

  23. ٢٣

    Match each methodology with a key trait.

    • Waterfall
    • Parallel
    • RAD
    • Agile / XP

    الإجابات

  24. ٢٤

    Match each RAD category with its idea.

    • Phased development
    • Prototyping
    • Throwaway prototyping
    • Prototype

    الإجابات

  25. ٢٥

    Match each item to Agile or RAD.

    • Self-managing team
    • Managed by a project manager
    • Based on prototypes
    • No reliance on prototypes

    الإجابات

أجبت ٠ من ٢٥